Posts by Admin
Wagner Technical Selected to Design Eversource – Fusion Solar Interconnect
Wagner Technical Selected to Design Eversource – Fusion Solar Interconnect Wagner Technical Services has been selected to design the seven mile connection between an Eversource (formerly Connecticut Light & Power) substation and the 20 megawatt Fusion solar farm under construction in Sprague and Lisbon, Connecticut. The Connecticut Public Utilities Regulatory Authority required the design to…
Read MoreNextGrid Field Inspector 2.0 Released
NextGrid Field Inspector 2.0 Released Wagner Information Systems released a new version of its NextGrid Field Inspector application. It is available as an online application that allows inspectors to complete daily inspections of ongoing projects, including photos. The new version simplifies reporting and allows management to view open and closed issues without reading through all…
Read MoreWagner Technical Completes Storm Resiliency Analysis in Connecticut
Wagner Technical Completes Storm Resiliency Analysis in Connecticut Wagner Technical completed storm loading and resiliency analysis of 8,500 poles in Connecticut. Even though we faced record snowfall and extreme temperatures, we were able to collect data with tablet computers and meet our deadline. As data was being collected in the field, designers in the office…
Read More